Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

PI Integrators

Showing 284 of 5192

Add support for TLS 1.3

TLS 1.2 is the highest version of TLS that PI Integrators currently support. Please add support for TLS 1.3 to make the PI Integrator web pages load faster and more securely.
Kenneth Barber over 3 years ago in PI Integrators / General 0 No status

Drop support for TLS 1.0 & TLS 1.1

Please drop support for TLS 1.0 & TLS 1.1. These have been known to be insecure protocols for a while now, are not supported by modern browsers, and have been superseded by TLS 1.2 & TLS 1.3. "Compatibility with older browsers" is not a g...
Kenneth Barber over 3 years ago in PI Integrators / General 0 No status

Add a "quality tag" to the Integrator jobs that tells the receiving system if the Data source is up or down.

Having an "up/down" or source-system quality check will help the receiving systems know if the data is flowing or stopped. If destination analytics are using the output of an Integrator and are expecting the latest values to be available in calcul...
Guest over 3 years ago in PI Integrators / General 0 No status

Allow Publishing of a Narrow Data Format

It would be helpful to be able to publish to a narrow format to reduce downstream impact due to the fact that we don't have to change the table structures when the assets change. (flexibility) https://en.wikipedia.org/wiki/Wide_and_narrow_data
Guest over 3 years ago in PI Integrators / General 1 No status

PI Connector for Siemens SIMATIC PCS 7: Add an attribute to an existing Event Frame template

PI Connector for Siemens SIMATIC PCS 7 creates a new Event Frame template each time an attribute is added. Therefore, the user gets Event Frame templates with almost no difference between them except for one or two attributes. A new feature that a...
Guest over 3 years ago in PI Integrators / General 1 No status

"Start Time" and "End Time" of a view reflect the data the view contains.

As someone who uses the UI to get a summary of what my views contain, I would like the view's "Start Time" and "End Time" to reflect the actual data contained within the view in the case that I "Update Data" in the view to be something outside of ...
Guest over 3 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 Declined

Always produce output table on publication: if there is no data to export when an asset view is published, produce an empty output table

I build asset views on a schedule with interpolated time points based on a PI Point. I also set these up before any data is added to the PI Point so on first publication there is no data to export. Currently the PI Integrator for Business Analytic...
Guest over 3 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 Declined

BI Integrator preserve Column Configuration on Filter Change

When you copy a BI Integrator Job ans change some settings in the Filter all attributes are added to the column view. We remove Attributes that are not needed e.g. Level1 Attributes when we only Need the Level2 Child Attributes. On a change the L...
koettih over 3 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 Declined

Allow for sampling rate that is faster than one event per seconds

High frequency data is increasingly common. With examples in manufacturing of events happening entirely within a few 100s of milliseconds. The request is to allow the export of interpolated data at a rate higher than the current limit of 1 event p...
Guest over 3 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 1 Declined

Automatically remove data from continuous views

As an engineer using PI View or SQL writers for a report, I would like option to remove data older than a certain cutoff. For example, a continuous view is used to generate data for a report on the last 8 hours. Data older than that are no longer ...
Guest over 3 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 8 No status