Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

AVEVA™ PI Vision™

Showing 1851 of 5209

Enhance the drawing options to allow the ability to draw freeform polygon.

Coming from PI ProcessBook. After migrating displays with polygons, the polygons are no longer adjustable. There is no way of creating a new (freeform) polygon like there is in ProcessBook
Thomas Peters about 2 years ago in AVEVA™ PI Vision™ / Symbols 0 No status

Ability to control object edge color

In addition to configuring fill color, ability to configure edge color of objects (valves, pumps). If object alternates between gray and white and is on a white (or near white) background, it gets lost when it turns white. Ability to make edge bla...
Guest over 1 year ago in AVEVA™ PI Vision™ / Look & Feel / Styling 0 No status

Support container deployment for PI Vision

As a PI System administrator, I am looking for the flexibility to quickly provide new PI Vision deployments to scale up overall visualization capacity and allow for easy separation between user communities. It would be ideal if it were possible to...
Clint Ostby about 2 years ago in AVEVA™ PI Vision™ / Administration 0 No status

Automatically set time interval for XY Plots

XY Plots have a hard-coded limit of 10k values. When generating a plot, it would be nice to have a function that, instead of throwing an error, adapts the time interval of the plot in order to stay under the 10k limit.
Guest about 2 years ago in AVEVA™ PI Vision™ / User Experience 0 No status

CSV-002 valve position does not reflect actual plant status

PI Vision page 442 for Containment Spray CSV-002 does not match what actual plant status in for All 4 Units. All 4 Units have the valve OPEN but it shows CLOSED.
Guest over 1 year ago in AVEVA™ PI Vision™ / Display Management / Displays Page 0 No status

Configurable XY Plot scale intervals

Be able to configure the scale intervals of XY Plots. Currently while it is possible to customise the scale range of the axes in XY Plots, it is not possible to be able to specify the scale intervals to be used.
Miwa Teranishi about 2 years ago in AVEVA™ PI Vision™ / Symbols 0 No status

Allow user to set defaults for trends (colors of traces and background, number of ad hocs per trend, font size, similar to Processbook

This would allow the user a consistent view when opening trends as well as being able to set font size to be able to view the trend on various size monitors. Also, having the ability to set the number of ad hocs per trend like Processbook allowed ...
Shane Loehr about 2 years ago in AVEVA™ PI Vision™ / Ad Hoc Analysis 0 No status

Allow Admin to control PI-Vision home page security

Currently, the PI-Vision home page is writeable to anyone who has access to save any PI-Vision displays. I want to allow every user to be able to create & save displays like they can in PI-ProcessBook, but I don't everyone to store their perso...
Joe Staublin almost 3 years ago in AVEVA™ PI Vision™ / Authoring Displays 0 No status

PIVision user to associate event frames with each other (Root cause and effect)

Event frames are often correlated with one another. "This caused that." One event was the cause for another. These associations are valuable human input, actually they represent discovery of latent issues and growth. To capture the leading edge in...
Steve Edwards almost 3 years ago in AVEVA™ PI Vision™ / Events (EF) 1 No status

Configure Default Display Folder in PI Vision

In PI Vision we have a display folder structure which always launches at the main folder level and users have to manually drill down to the desired subfolder. Requesting the option for individual users to configure a default folder to avoid manual...
Simone Clement almost 3 years ago in AVEVA™ PI Vision™ / Display Management / Displays Page 0 No status