Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 4931

trend log objects (BACnet object type 20) available from the connector

BACnet trendlog object present the opportunity to buffer at the edge where the data is collected and to gracefully recover from comms outages if data collection has been impacted. I would suspect the trendlog object could be handled similarly to ...
Guest over 2 years ago in PI Connectors / PI Connector for BACnet 0 No status

Wonderware Historian Connector should store some metadata in PI tag attributes

The Description, Maximum EU, Minimum EU, Engineering Units, etc. that are stored in the Wonderware historian should be stored in the PI tags' attributes as well as the Wonderware AF structure.
Guest over 2 years ago in PI Connectors / PI Connector for Wonderware Historian 1 No status

Add instrumentation to the PI System Connector

Need to add instrumentation to PI System Connector wheras exposing perfmon counters (so PI perfmon can store accordingly in PI tags) on AVG data flow in events/sec for a 120 seconds time period, status of the connector, etc
Guest over 2 years ago in PI Connectors / PI System Connector 1 Declined

Improve the structure of the history recovery after connector restarts to ensure that initial period of history recovery is complete

The 30-day history recovery by the connector after restarts should get activated only after the initial history recovery is confirmed to have completed successfully.
Guest over 2 years ago in PI Connectors / PI System Connector 0 No status

Adjust GE e-terraHabitat Connector to support e-terraPipeline systems

The Pi Connector for GE e-terraHabitat systems was apparently only written to support GE's Electrical SCADA systems (EMS/DMS) that are based on e-terraHabitat. They also have Oil & Gas Pipeline SCADA systems, also based on e-terraHabitat, know...
KPRoth over 2 years ago in PI Connectors / Other specific PI Connector 0 No status

Remove AF Requirement for PI Connector for OPC UA

Remove the AF requirement for PI Connector for OPC UA. Users who may only be looking to send data from PI Connector for OPC UA to Data Archive are currently forced to configure connections/security for AF as well during initial setup.
Roger Ward over 2 years ago in PI Connectors / PI Connector for OPC UA 0 No status

Buffering Manager should have tuning parameter for Points with Post Errors

Right now there is a PerfMon counter for Buffer Health.  It's either 0, 1, or 2.  That's not helpful because it doesn't tell you what is wrong.  There are other PerfMon counters for Remaining Queue capacity and Points with Post Erro...
taterhead247 over 2 years ago in AVEVA™ PI Server / General 1 Tell us more

AF Transformer logging improvements

Improve AF Transformer logging: In some cases it's hard to investigate why AF Transformer doesn't include certain elements in transformation. it would be helpful to have a debug level that enables following features: - log element names that were ...
Guest over 2 years ago in AVEVA™ PI Server / General 1 Declined

Allow passing parameters to XML script file so that I can maintain one general script for many sites

Below in the examples are the parameters that would change from site to site.  Other than these parameters the transformation XML script is identical across sites.  With parameters, it would be simpler to maintain these files. • Host, D...
Guest over 2 years ago in AVEVA™ PI Server / General 0 Declined

Ability for tour to have multiple tiers of approval

As an administrator, I would like for PI ML to have the ability to create a multi-tier approval workflow so that manually entered data needs to be approved by one or more levels up the hierarchy before data is stored in the data archive?
Guest over 2 years ago in AVEVA™ PI Vision™ / Manual Data Entry / PI Manual Logger 1 Declined