Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 4906

Ability to update the AF Server name in Data Collection Manager without Recreating the Destination

Currently, it is not possible to update the AF Server name in the DCM without recreating the Destination. This process is prone to errors since the configuration for the AF and PI Data Archive servers needs to be recreated. Having the ability to ...
Luis Camacho Forero about 2 years ago in PI Connectors / General 0 No status

Allow real-time data flow to continue for connectors when the Point Count Maximum has been exceeded

When the point count maximum defined in the license file has been exceeded, this interrupts real-time data flow for all PI Connectors until the error is cleared. This affects an reports or time-sensitive operations relying on production data. Data...
Guest about 2 years ago in PI Connectors / General 0 No status

Allow for out of the box monitoring options for all connectors similar to the functionality

Allow for out-of-the-box monitoring options for all connectors similar to the functionality of interface performance monitoring (i.e. provide the option to monitor IO rate, connector status, etc.).
Guest about 2 years ago in PI Connectors / General 0 No status

ProcessBook - Add Pulp and Paper Symbol Library

Add Pulp and Paper Symbol Library, black Liquor  Evaporators, Lime Kiln, , Digester Batch equipaments.
Guest about 2 years ago in AVEVA™ PI Server / General 0 Declined

Archive Gaps value from SMT>Operation>Archives as a PI Health Tag/Performance Counter.

No description provided
Jose Sanchez Colunga about 2 years ago in AVEVA™ PI Server / General 0 Declined

Add additional highlight for Knowledge Base Articles that has a confidence of "Not Validated"

add additional highlight on the external articles that are "Not Validated". e.g. Red highlight on the confidence section or highlight on the title name. This would allow the reader to pay more attention that the proposed in solution section of the...
Guest about 2 years ago in AVEVA™ PI Server / General 0 No status

Polybase Support with PI SQL Client

Creating a Polybase External Table with a PI SQL Client connection via ODBC causes query errors showing only it only supports column-wise binding. Polybase attempts to utilize row-wise binding which is not supported. Developers and customers have ...
Guest about 2 years ago in AVEVA™ PI Server / General 0 No status

As PI Vision feature , Is it possible to add MultiState to trends?

As PI Vision feature , Is it possible to add MultiState to trends? We can change color for symbols and shapes based on change in Tag Value but cannot apply same for Trends. Can we add multi state on trends?
Guest about 2 years ago in AVEVA™ PI Vision™ / Symbols 0 No status

Provide a way to add Haystack, Brick or ASHRAE 223 meta data markers/tags to PI points or within AF.

Commonly used fault reporting software, such as SkySpark, visualization, GIS and Advanced Analytics applications are requiring metadata/markers embededded in the tags in addition to Tag Name, Timestamp and Value. Not having a native way to add the...
Guest about 2 years ago in AVEVA™ PI Server / General 1 No status

Manual data entry to a PI Tag with validation for future data

Manual data entry to a PI Tag with validation for future data. We want to implement a 'No Touch' policy for a start/end time (duration) where power plants cannot go for maintenance due to peak load requirements. While Excel and Manual Data Logger,...
jagdish.konathala about 2 years ago in AVEVA™ PI Vision™ / Manual Data Entry / PI Manual Logger 0 Declined