Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 3577

Different email formats for event start and end conditions

There is a requirement to include different information in the email body depending on whether the notification is for the event start or end. Typically, the event start email includes the start time and start values and the event end email also i...
Guest over 3 years ago in AVEVA™ PI Server / Notifications 0 No status

Include MSXML with the latest version of the PI Interface for OPC XML-DA

The Read-Only version of the PI Interface for OPC XML-DA (1.7.3.40) does not contain the msxml4 library necessary for communicating with the OPC XML-DA. The workaround is to install the Read-Write version of the interface and then the Read-Only ve...
Randy Giguere 11 months ago in PI Interfaces / Other Interfaces 1 No status

Disable the recalculation auto when filtering the result

The problem is that after the calculations of PI Data Link Functions, I want to review the results by applying Filtering to the rows, but as soon as I set up the Filter, Excel immediately runs the calculation again. I have to wait until the calcu...
Guest 11 months ago in AVEVA™ PI DataLink™ / Settings 0 No status

PSE attribute search by data reference

Extend attribute search in PSE to limit search by data reference. One use case is when we want to do a reset to template in bulk, it would be nice to only return attributes that use PI Point data reference. If I understand the release notes correc...
Brent Bregenzer over 3 years ago in AVEVA™ PI Server / Asset Framework (AF) 0 No status

Trigger notification email when event frame has been acknowledged

I would like to configure notifications such that an email is sent when the event frame has been acknowledged.
Guest over 3 years ago in AVEVA™ PI Server / Asset Framework (AF) 1 No status

List client connections made to a specific AF database

We can easily see client connections made to an AF Server using the Connections tab in AF Server Properties. It would be nice to have a similar functionality for databases so we can see how much traffic each database gets. Useful in the event a c...
Guest over 3 years ago in AVEVA™ PI Server / Asset Framework (AF) 1 No status

Rollup Analysis - Filter Attribute Names at both Root & Child Level

Requesting the ability to be able to filter at BOTH the root level (parent attribute) and child level (child attribute) when doing a rollup analysis. If you have the same child attribute names under different parent attributes (i.e. Children: YTD...
Guest over 3 years ago in AVEVA™ PI Server / Asset Framework (AF) 0 No status

UOM field should accept substitution parameters

It would be nice if the UOM field of an AF Attribute would accept substitution parameters. This way if an attribute is a reference to another, the UOMs could also be linked. If the UOM is updated on the source, it would also get updated in the ref...
Guest over 3 years ago in AVEVA™ PI Server / Asset Framework (AF) 0 No status

Re-size ProcessBook display during migration to PI Vision

Some PI ProcessBook displays migrated into PI Vision are too large to fit into the screen size even when using Fit All or zooming out to the maximum due to hardcoded maxScale. We would like to be able to re-size the display (including all symbols...
Guest over 3 years ago in AVEVA™ PI Vision™ / ProcessBook Migration 1 No status

PI Vision Usage Report store time frame

Ability to reset PI Vision Usage Report after a specific period of time. Example: Store only last X years of data.
Guest over 3 years ago in AVEVA™ PI Vision™ / Reporting 1 No status