Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

Status Declined
Categories Functions
Created by Kenneth Barber
Created on Aug 16, 2022

Eliminate the "calculation basis" argument for Calculated Data

Consider eliminating the "calculation basis" argument (time-weighted versus event-weighted) for Calculated Data. Reasons:

  • Average already has 2 calculation modes, 1 for each calculation basis.

  • Minimum, maximum, and range produce the same value whether they are time-weighted or event-weighted.

  • Time-weighted count is useless and so is not needed.

  • Time-weighted total (i.e. integration over time) and event-weighted total are not even in the same dimension, since integration over time multiplies the unit by time, but an event-weighted total does not. These should be separated into 2 calculation modes. Consider calling the time-weighted total something like "totalize" or "integral" or "time-integral" and calling the event-weighted total something like "total" or "sum".

  • The final step to eliminating the "calculation basis" argument is to have 2 calculation modes for standard deviation, similar to average.

  • ADMIN RESPONSE
    Aug 16, 2022
    Hello Everyone, While we appreciate the community's interest in this suggestion, we have decided to decline this item in favor of other high-priority work the product needs. Thank you for your feedback, and please continue sharing suggestions for improving PI DataLink for you! Thanks, Victor Zhang OSIsoft, Product Manager
  • Attach files
  • Admin
    Victor Zhang
    Reply
    |
    Dec 19, 2022

    Thanks for the suggestion, Kenneth. I particularly like Bullet Point 4 about renaming the 2 calculation modes for total to make them self-explanatory.