Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

Status No status
Product PI Integrators
Created by Guest
Created on Aug 16, 2022

Sign up for updates on the PI AF Server for new event frames

Currently, the PI Integrator for BA 2018 will add rows for event frames ending within the scheduled update time range. It would be better if the PI Integrator signed up for updates on the database and gets a list of all new or modified event frames to handle the cases where event frames are closed with an end time in the past that is not covered by the run period anymore.
  • Attach files
  • Guest
    Reply
    |
    Aug 16, 2022
    Use cases: 1) It's not uncommon for analyses to be triggered and close event frames several minutes into the past. Lab values that are entered manually are one example. Refer to case 900272. 2) Mobile assets often have limited connectivity to send data to the PI System. Often times, they will lose connection for 2-3 hours, and finally update data when arriving back to home base. These event frames are backfilled into the PI AF Server by PI Analysis, but do not get published by the PI Integrator
  • Guest
    Reply
    |
    Aug 16, 2022
    Currently we have a PIBA (PI Integrator for BA) View, publishing to a SQL table, that is set to Run in a Continuous Mode (once a day from *-7d to *) for the event frames for building KPIs with Power BI. Classifications of event frames with PI Vision by Operations employees can happen or change days after the event occurs. We would like PIBA to backfill anything that has changed during that 7 day (or any number of days) window.
  • FrancoB
    Reply
    |
    Aug 16, 2022
    Why is this not possible? We are using PI Integrator to send event frames to PowerBI but subsequent comments and updates on event frames are not updated by Pi Integrator. This makes the PI Integrator, Power BI link very limited in its functionality.