Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 82

The DNP3 Adapter should support group 40

The interface supports this group. The Adapter does not (see https://docs.aveva.com/bundle/adapter-for-dnp3/page/1231146.html). It is essential that the Adapter have this identical feature as the interface, to allow it to read the same data and be...
Daniel Lopez 8 days ago in AVEVA™ Adapters / AVEVA Adapter for DNP3 0 No status

The Adapter framework needs to be able to perform scaling on raw data

Many users want to use Adapters for the nre abilities they offer versus Interfaces: Support for containers, Linux, edge deployment, new failover and fault tolerance, integration with CONNECT Data Services, etc. HOWEVER, many sites use Interfaces t...
Daniel Lopez 5 months ago in AVEVA™ Adapters / AVEVA Adapter for DNP3 1 Future consideration

Enable Including Event Frames in Time Based Report

It would be useful to have the possibility to include EFs in a Time Based Template. For example: - if downtime events are recorded as Event Frames, I would like to report on all the downtime EFs occurred in the last month (for example), includin...
Guest over 3 years ago in AVEVA™ RtReports 2 No status

Be able to export data to excel with an option to enter/select time intervals

After creating a multidisplay, would it be possible to export the multidisplay data to excell spreadsheet with an option to choose time interval?
Guest 2 months ago in AVEVA™ RtReports / General 0 No status

Properly link comments, verifications and approvals to batches

When Unit Procedure level criteria are used to link a report template to batches, it is possible to select any Unit Procedure, Operation, Phase or step to generate the report. Whatever the selected Unit Procedure, Operation, Phase or step, the ge...
cmartineau almost 3 years ago in AVEVA™ RtReports / Generator 0 No status

Allow configuration of Trend legend position

As an report designer, I would like to be able to choose the position of the legend on Trends.
Guest over 3 years ago in AVEVA™ RtReports 0 No status

PI Interface DNP3 - unsolicited data listen only mode of operation requested

Is there an option in DNP3 driver (In fact at TCP level) to make it listen on a certain (usually 20000 for DNP3)? In era of IoT devices, most devices are sleeping devices, they wake up usually once a day and push data to DNP3 Master (PI), however ...
Guest over 3 years ago in AVEVA™ Adapters / AVEVA Adapter for DNP3 2 Tell us more

Automatically generate official print after batch completion

Customer would like to be able to automatically generate an official PDF printout at the completion of a batch or at the end of time-periods for time based reports. In the case where MES systems are used, some customers merely need to attach an o...
Guest over 3 years ago in AVEVA™ RtReports 0 No status

Conditional Approval

Provide more power and flexibility to who approves reports. Currently, you can set the order of approvals. It would be nice to be able to determine who or which approval track a report goes to or undertakes based on the results of the batch (IE ...
Guest over 3 years ago in AVEVA™ RtReports 1 Declined

Send notification to next approver-group in approval cycle

Provide the possability to send notifications based on the approval-cycle status of the report. For example: In a "two-steps" approval cycle, send a notification to the final approval group when the first group approved the report.
Guest over 3 years ago in AVEVA™ RtReports 0 Declined