Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

My votes: Analytics / Calculations

Showing 51 of 4776

Increasing Size of CSV Export File

Currently, when exporting any display to a CSV for manipulation via Excel, I've noticed that the number of objects (rows) recorded for this file cannot exceed 3600, even when further data is requested for export. Is there a way to change this?
Guest 6 months ago in AVEVA™ PI Vision™ / Analytics / Calculations 1 No Status

AVEVA PI Vision Trend should have the option to return archived values rather than the interpolated values based on the number of intervals in the trend depending on pixel width

PI Vision Calculation data in Trends are not accurately showing outlier values depending on trend sizing. The discrepancies are caused when the width/pixel size of the display varies between trend symbols, which affects the intervals used for eval...
Dong Yeow Wong 9 months ago in AVEVA™ PI Vision™ / Analytics / Calculations 2 No Status

Average calculation not working through Pi Vision Calculation editor

Time-based average (eg. 15min average) calculation not working through Pi Vision Calculation editor. Presently while using Avg('tag'), the result is only the instantaneous value at the end of 15 minutes, and not the average over 15 minutes.
AK 10 months ago in AVEVA™ PI Vision™ / Analytics / Calculations 1 Already Exists

Rate of change calculation is required for analysing points

Rate of change calculation is required for analysing points, especially steam parameters like temperature and pressure. This is required for fatigue analysis. For a selected time frame, the following four calculations will be required: 1) Maximum ...
AK 11 months ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No Status

PI Vision Event Frames based Calculations

Ability to create Event Frames based Calculations in PI Vision, using its attributes context.
Eduardo Miller over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No Status

EventCount() expression in PI Vision Asset based Calculations

Have the ability to use EventCount() expression in PI Vision Asset based Calculations
Eduardo Miller over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No Status

PI Vision Calculation with PI Point and PI AF attributes

Possibility to create PI Vision Calculation with PI Point and PI AF attributes in the same expression.
Eduardo Miller over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No Status

if statement in calculation

change multistate operator so user can select it or allow if statement
Guest over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No Status

PI Vision Calculation Feature: Sum Two Tags into a New Tag

Would like a feature in PI Vision that can take a newly defined tag name (A) using calculation feature and another newly defined tag name (B) and sum them up to a new tag (A+B) in PI Vision Calculation.
Guest over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No Status

Filtering tag with another tag

It would be very useful to be able to filter data with a different tag than the one we want to filter.
esancha over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No Status