Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 142 of 5285

Allow the ability to either export a CSV or copy the contents of the Report Properties window

Customer wants to be able to export a report list to Excel.  In the RtReports Editor you can generate a list of reports in the Report Properties window but it is not possible to export or copy. Enhancement Request:  Allow the ability t...
Guest over 3 years ago in AVEVA™ RtReports 1 Declined

Add the capability to create striplines on the trends.

Having the capability to add striplines to the trend feature could help indicate events that occur on the trends. For example, this could help identify what step or part of a process a batch is in when reading a temperature trend to help induce wh...
Guest about 2 years ago in AVEVA™ RtReports / Editor 0 No status

Rate of change calculation is required for analysing points

Rate of change calculation is required for analysing points, especially steam parameters like temperature and pressure. This is required for fatigue analysis. For a selected time frame, the following four calculations will be required: 1) Maximum ...
AK almost 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Time range configurable to attribute value

Allow the time range (either start time or end time or both) in Pi Vision to reference an attribute value. This would allow data to dynamically update according to an event. For example, I want to see a list of batch information (start time, end t...
Guest over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Use AD group membership for RtReports

Provide the ability to use domain groups to define RtReports group membership on the RtReports server
Guest over 3 years ago in AVEVA™ RtReports 0 Declined

Allow the user to control the font and position of the Official Print

Provide the ability to control the font or position of the Official Print in the Editor and Generator.
Guest over 3 years ago in AVEVA™ RtReports 1 Declined

Improve the user experience of the "Report Edit" window

When editing the report Criteria in RtReports, editing the text fields leaves the "OK" button grayed out. In the attached screenshot, the user has edited the "Recipe" criteria field and then clicked into the "Product" criteria field. The "OK" butt...
Guest over 3 years ago in AVEVA™ RtReports 1 Declined

Prevent table rows from being split across pages

A table row with wrapped text can be split across multiple pages. Provide the ability to shift the entire table row to the next page if it would be split across pages.
Guest over 3 years ago in AVEVA™ RtReports 0 Declined

UOM and Display digit options for calculation in vision

Similar to point builder, there should be an option for putting Eng Unit and Display digit within vision.
Piyush Dubey almost 2 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

AVEVA PI Vision Trend should have the option to return archived values rather than the interpolated values based on the number of intervals in the trend depending on pixel width

PI Vision Calculation data in Trends are not accurately showing outlier values depending on trend sizing. The discrepancies are caused when the width/pixel size of the display varies between trend symbols, which affects the intervals used for eval...
Dong Yeow Wong over 2 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 2 No status