Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Integrate Video data with Event Frames (EF)

Be able to view data in the context events and integrate video data with the start of event frames (play back the video of the machine failure overlaid with the trend data).
Guest about 4 years ago in AVEVA™ PI Vision™ / Events (EF) 3 No status

Improve ability to search for batch-based Event Frames

Batch users need a search option that's specific to batch-based Event Frames. Customers should be able to natively search by BatchID, Product, Procedure, and Recipe, so long as their Event Frames are based on the default Batch-based Event Frame ...
Ellery Murdock about 4 years ago in AVEVA™ PI Vision™ / Events (EF) 2 No status

Retrieve all symbols used in a PI Vision display

Would like the functionality to retrieve a list of all symbols used in each PI Vision display or across all displays in the Vision database. This function would be performed either within PI Vision, via the Display Utility or using a Script. Addi...
Guest about 4 years ago in AVEVA™ PI Vision™ / Display Management / Displays Page 1 No status

Polar plot

I want to be able to do a polar plot! We have the need to monitor deformation in the stator of a hydro turbine. The you can see if the stator is oval. The time-series data behind must have an configurable time space. Start time, period.
Hobbe about 4 years ago in AVEVA™ PI Vision™ / Symbols 2 Declined

Table: Labeling Options for Name column

Add ability to control what is shown in the Name column. This should have the same options as other symbols: attribute name only, description, asset name, or use custom label to provide a friendly name
holemn about 4 years ago in AVEVA™ PI Vision™ / Symbols 1 No status

Store bad quality from OPC XML DA Server

Enhance the OPC XML DA Interface to store bad quality values from its OPC XML DA Server in PI, so that the values, timestamp and status from bad quality data are saved in PI. Note: This is work item 21742OSI8 - Add support of data quality.
Guest about 4 years ago in PI Interfaces / Other Interfaces 0 No status

Encrypt trafic between interfaces/connectors and the Data Archive

Add an option to encrypt trafic between interfaces/connectors and the PI Data Archive
Guest about 4 years ago in PI Interfaces / Other Interfaces 2 No status

Update the CA ISO interface in preparation for the upcoming API V8 deployment

CA ISO is planning to upgrade its ADS (automated dispatch system) to version 8. This upgrade introduces breaking changes from the current system, API version 7. The CA ISO interface should be updated to account for these changes.
Guest about 4 years ago in PI Interfaces / Other Interfaces 2 No status

Use range of PI Vision display for calculations on that display

This is pretty self explanatory. You should be able to include the timespan for the PI-Vision display in the calculations for that display. e.g. you should be able to take the TagMean for a tag for the span of the PI-Vision display and use it in c...
David Boswell almost 2 years ago in AVEVA™ PI Vision™ / Ad Hoc Analysis 1 No status

Allow Units of calculations to be used in displays, not only on top but to the right, left or below.

A tag is giving a simple calculation e.g. TAG_MW * 1. But the calculation has no where to specify the engineering units and it also does not derive that MW * 1 will still be MW. When you place this on the diagram you cannot place the units to the ...
Guest 9 months ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status