Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 74 of 5219

Migration from interface to connector

Would like a way to migrate from interface to connector as easily as possible.
Guest over 3 years ago in PI Connectors / PI Connector for BACnet 2 No status

Add failover capability for the BACnet Connector.

Failover similar to the UFO available for UNIint interfaces.  Warm failover would be sufficient, although I'm sure there are some who would like cold and hot as well.
Chris Wozniak over 3 years ago in PI Connectors / PI Connector for BACnet 1 No status

Golden Batch / Comparing current event values

We can visually compare current events and Golden Batch with the 'Pinned' on PI Vision 2017. I believe it would be interesting to compare current attribute values and Golden Batch values. For instance, for an active event, when the current tempe...
Carlos Sola over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 Declined

Assign units to tag-based calculation

When creating a tag-based calculation, allow the user to set unit of measure through a text field. The units can then be displayed within symbols on the main display.
Amit Dutta about 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Possibility to use array values in analysis

I would like to use array attribute values in analytics. For example, I have the coefficients of a polynomial curve stored in an array and I would like to use this to calculate que Producible Power of a WTG. Storing this kind of data in separate a...
Guest over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 1 Declined

BACnet SC/SuperConnect Support

Support for the BACnet SC/SuperConnect protocol for the PI Adapter, PI Connector, or PI Interface.
Connor Hawkins almost 2 years ago in PI Connectors / PI Connector for BACnet 4 No status

trend log objects (BACnet object type 20) available from the connector

BACnet trendlog object present the opportunity to buffer at the edge where the data is collected and to gracefully recover from comms outages if data collection has been impacted. I would suspect the trendlog object could be handled similarly to ...
Guest over 3 years ago in PI Connectors / PI Connector for BACnet 0 No status

More Standard Symbols - Heatmap, Countours, Stacked bar chart with time

Hi Want more, instead of using Excel. Regards Ulf Kristian Sandvik
Guest over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

How to built the PI vision calculate function for pump running time

Dear All, I need to built the calculate function in PI Vision That to calculate the pump running time When pump start, start counting time (in hours) until stop. After stop time must be reset to 0
DUONG PHAN over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Add the function/calcultion of "Moving Average" for PI Tags

The ability to create an average calculation is within PI Vision, but it doesnt do moving average. You can set custom timing intervals (eg. every 5 min etc.) but what about a 5 min moving average that has a continuou data points for a trend. A wor...
Mitchell Davidson over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status