Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Improved logging for the PI Vision display utility

When copying displays from one PI Vision host to another, you can run into errors at the last step. Often the log only contains "Copy Failed". This becomes very challenging to track down the issue.
Nathan Skitt over 1 year ago in AVEVA™ PI Vision™ / User Experience 0 No status

Request New Vertical Trend Symbol

Please provide a new symbol that is a vertical trend (a.k.a. vertical chart). Utility System Operators like Pi Vision but are also very used to vertical trends from the old GE charts. These users are hesitant to convert over to Pi Vision for syste...
Jonathan Gibbs over 1 year ago in AVEVA™ PI Vision™ / Symbols 1 No status

Prevent an user from approving more than once

When a report has multiple approval cycles with the same group (or with different groups that have some people in common), it would be useful to have the option of preventing the same user from completing all approval cycles, so that they must be ...
Guest almost 4 years ago in AVEVA™ RtReports / Generator 0 No status

Please consider an option, so i can freeze my upper part with info, so this will be fixed when i scroll down, like this is possible with microsoft excel

Please consider an option, so i can freeze my upper part with info, so this will be fixed when i scroll down, like this is possible with microsoft excel
Guest 6 months ago in AVEVA™ PI Vision™ / Display Management / Displays Page 0 No status

Alert if ingress detected to be in a bad state

During 2 recent lighthouse projects, most recently with Kimball Electronics, the machine hosting the PI to CONNECT agent experienced a reboot due to patch installations. PI to CONNECT didn't properly restart (we'll investigate that separately) and...
Guest over 2 years ago in PI to CONNECT / General 0 No status

can we ad normal files as hyperlinks to buttons from a local networkdisk

( example --> S:\pictures\tankfarm.jpeg ) with pi processbook it was possible , with pi-vision i didn't find yet !
Guest over 2 years ago in AVEVA™ PI DataLink™ / Functions 1 No status

PI Vision should connect to all collective members in case a collective member is unavailable

Currently, PI Vision connects to a single collective member based on the priorities set in the AFSDK KST (known server table). However, if that collective member becomes unavailable due to an issue (pairchss crashing, network etc etc), the PI visi...
GaryYegiazaryan almost 4 years ago in AVEVA™ PI Vision™ / Administration 3 No status

Improve performance of creating large numbers of new tags

I have three large customers who have experienced PI Data Archive performance issues when large numbers of tags are being created. Specifically, record locks seem to take an extra large time (e.g., more than 15 minutes) to clear, and data updates ...
Laurie Dieffenbach almost 2 years ago in AVEVA™ PI Server / System Management 1 No status

Ability to Copy and Paste Data from Tables in PI Vision

We have multiple tables with AF attributes which include data such as description, PI tag name, value, average, URL, etc. It would be nice to be able to right click on a square of the table and copy the PI tag name, average, or other data from the...
Kyle Tomshack almost 3 years ago in AVEVA™ PI Vision™ / User Experience 1 No status

Allow multi-select in asset switching

Enable the ability to add multiple elements to a dashboard built on one element using asset switching. We use a different subset of equipment used for different projects and currently teams need to derive a display from other for every project whi...
Jared Rodeheaver 6 months ago in AVEVA™ PI Vision™ / User Experience 0 No status