Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 4926 of 4926

Securing the PI System

As an ICS systems engineer, I need to understand and easily configure Authentication and Authorization settings to secure the PI System from the point of data collection to data access and remote display viewing.
Guest over 2 years ago in AVEVA™ PI Server / Security 0 Declined

Allow PI Server components to be removed at installation time

Currently, when you run the PI Server install kit to perform an upgrade, existing PI Server components cannot be unselected, and so they are upgraded. This gives the impression that they cannot be uninstalled, but they can actually be uninstalled ...
Kenneth Barber over 2 years ago in AVEVA™ PI Server / Installation 0 Declined

Allow NTLM-authenticated local accounts while installing PI Analysis Service on a computer other than the PI Asset Framework computer

After installation, the PI Analysis Service can run under a local account even if the PI Asset Framework is installed on a different computer, since NTLM authentication can be used between both computers. However, the PI Server install kit does no...
Kenneth Barber over 2 years ago in AVEVA™ PI Server / Installation 0 No status

Allow user to select if Services start after upgrade

Give the user the option to not start the PI Services following an upgrade. This allows the user further control, especially during an outage/downtime event to perform the first reboot after an upgrade without beginning to take on data or connecti...
Nathan Skitt over 2 years ago in AVEVA™ PI Server / Installation 0 No status

Have Option to Enable Exception Testing

Related enhancement request: https://feedback.osisoft.com/forums/555139/suggestions/37362121. There are use cases where the need for exception go beyond simply reducing network traffic achieved by the current wire-level compression. The Ethernet ...
Guest over 2 years ago in PI Connectors / PI Connector for Ethernet/IP 0 No status

Disable Meta data collection for the PI Connector for Wonderware Historian

We would like to have a way to disable the PI Connector for Wonderware Historian's ability to  collect descriptions and engineering units in the historian.  These can be incorrect at times in the Wonderware Historian.
Guest over 2 years ago in PI Connectors / PI Connector for Wonderware Historian 1 No status

PI Connector for Cygnet - Historical Data Recovery

The PI Connector for Cygnet is normally used for real-time data acquisition. But, some times it becomes necessary to migrate large volumes of historical data between Cygnet and PI. There is a back filling application that can be used to do this, ...
Guest over 2 years ago in PI Connectors / PI Connector for Wonderware Historian 0 No status

Override PI Point Attributes in PI System Connector

For each PI Point query (Data Archive Only), I would like to specify certain attributes: mainly security. Defaulting to PIPOINT security string is preventing us from using this product because we have special security strings for tags to 1) keep s...
taterhead247 over 2 years ago in PI Connectors / PI System Connector 0 No status

PI Connector for Siemens SIMATIC PCS7 relay support

Allows customers to leverage the PI Connector relay for improved security, ease of deployment and maintenance when PI Connector for Siemens SIMATIC PCS7 is implemented in a process network with DMZ communication to the corporate network.
Guest over 2 years ago in PI Connectors / Other specific PI Connector 0 No status

Build native connectivity to Roche Diagnostics QC systems

Roche Diagnostics has built a suit of quality control devices (CEDEX Analyzers) for process control in bio-processing. It would be very important for the business to create in collaboration with Roche Diagnostics a native PI Connector.
Guest over 2 years ago in PI Connectors / Other specific PI Connector 0 No status