Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 3621

Adding PI to CONNECT Transfer replication behaviour based on Edit Mode Search

Problem: Currently, each asset and stream from the PI System must be added individually to the PI to CONNECT Transfer. If an organisation wants to replicate all assets in a specific category or under a root element of the PI Asset Hierarchy, every...
Guest 7 months ago in PI to CONNECT / General 0 No status

Enabling PI to CONNECT Transfer Configuration via API

Current Issue: To use CONNECT Data Services productively, we need to import sequential data streams and assets from our PI System. However, our asset landscape changes frequently. Manually adding each new asset and stream is time-consuming and lim...
Guest 7 months ago in PI to CONNECT / General 0 No status

The PI Integrator for Business Analytics should support data retention for continuously published views

Currently the PI Integrator for Business Analytics does not have a feature that would automatically delete older data from existing scheduled views. As a piadmin, I would like a feature to be added so that the integrator can be configured to updat...
Bethany Jewett about 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 No status

Is there a way of enabling a confirmation window when modifying AF attributes or PI Points?

Suggestion:Would it be possible, in AF revisions and even in tag revisions via PI-SMT, to have a window open whenever any change is made, requesting the reason for the change? And would this information be stored somewhere with the attribute path,...
Ana Izzi 4 months ago in Developer Resources / General 0 No status

Use tags as inputs for configuing multi state thresholds

I want to use a tag insatead of a hard coded number to break out multi state configurations in PiVision displays. For example, if the goal is for a box to fill red when a certain value is reached.. I want that to be able to reference a tag, so it ...
Guest 7 months ago in AVEVA™ PI Vision™ / User Experience 0 No status

Improved logging for the PI Vision display utility

When copying displays from one PI Vision host to another, you can run into errors at the last step. Often the log only contains "Copy Failed". This becomes very challenging to track down the issue.
Nathan Skitt 11 months ago in AVEVA™ PI Vision™ / User Experience 0 No status

Display Attributes with PI Tag Names in Pi Vision Display

It would be helpful if PI Vision would have a symbol or allow users to create a custom symbol where we can show a table of attributes and their associated PI Tag names. This would be useful for operators and engineers working in the manufacturing ...
Guest about 3 years ago in AVEVA™ PI Vision™ / Symbols 0 No status

Multi-State Change More Than Asset Fill Color

Allow muti-states to change other parts of assets, such as outline or value, as opposed to just the fill color.
Jackson Ogaard over 1 year ago in AVEVA™ PI Vision™ / Look & Feel / Styling 0 No status

Allow Dynamic Ranges on Graphs Based on Attributes in Event Frame

My event frames contain a list of attributes that state when different steps in a process start. They are in the correct time format for PIVision. I want to be able to build a dashboard that has multiple grahps and assign the start and end times f...
Guest about 1 year ago in AVEVA™ PI Vision™ / Events (EF) 0 No status

Please add product name (eg 2018 SP2) to the version information in PI SMT

You have to translate between software version (eg 3.4.445.688) and the product name (eg 2018 SP2) by searching for a document in support. It would make sense to show the product name in PI SMT alongside the software version
Guest about 1 year ago in AVEVA™ PI Server / System Management 0 No status