Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

Status Declined
Categories System Management
Created by Guest
Created on Aug 19, 2022

Configuration as Code PI System wide

"As a business owner, I want to set up change control procedures where any change to the PI System, be it the data archive, asset framework, PI Interfaces, PI Connectors, or any other component is done through a change in source controlled configuration files so I can track change requests, assign them to reviewers, and automatically apply them to production after the changes are applied to a test environment and satisfy automated tests. The configuration should be flexible enough to work with other deployment scripts so new servers can be automatically provisioned and configured if the configuration requires it." Essentially I'd like to be able to apply modern configuration as code and continuous deployment strategies to all components of the PI System. Parts of this are already possible with the Desired State Configuration libraries (covering PI DA and AF), but a lot of components cannot be configured through code and require an administrator to use a user interface to interact with the software, and automated tests cannot be run against most components easily. These principles are used in management of many business critical real-time applications in the IT space. Being able to do this with the PI System will enable enforced change control procedures and reduce breaking changes to production environments in large organisations.
  • ADMIN RESPONSE
    Aug 19, 2022
    We have reviewed this idea, and it’s not something we plan to implement at this time. Even though we are declining this idea for now, it is still open to comments. We do want to hear your opinion. Thank you for the feedback, and please, keep sharing!
  • Attach files