Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Search results

Showing 29 of 330

Bitmask Functionality in AVEVA PI OPC UA Adapter

During the migration from the PI OPC DA Interface to the AVEVA PI OPC UA Adapter, we noticed that the ability to apply bitmasks to incoming values is no longer supported. This functionality is critical in many existing implementations, especially ...
Dennis Fendel 6 months ago in AVEVA™ Adapters / AVEVA Adapter for OPC UA 0 Future consideration

Option to delete target data table when view is deleted

When a PI View is deleted from the Integrator User Interface, the Publication Metadata and target data tables are both deleted for that view. For a view with a non-PI View target such as a SQL target, however, only the Publication Metadata table i...
Guest over 3 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 9 No status

OPC UA Adapter Create Tag on Discovery

For the OPC UA Adapter, we are noticing that a tag won't be created until a data point comes in after the tag is added to the data filter. That causes issues for slow updating tags. For instance an open/shut valve that is rarely operated. We have ...
Damon Vinciguerra 4 months ago in AVEVA™ Adapters / AVEVA Adapter for OPC UA 1 Future consideration

Sign up for updates on the PI AF Server for new event frames

Currently, the PI Integrator for BA 2018 will add rows for event frames ending within the scheduled update time range. It would be better if the PI Integrator signed up for updates on the database and gets a list of all new or modified event frame...
Guest over 3 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 3 No status

Please add a feature for the OPC UA adapter to enable the adapter to only store values with a good status or rather filtering out bad values

When receiving bad values from the OPC UA Server to the adapter there is no option to filter out bad values. So these values get stored in the Data Archive and are causing problems with analyses (e.g. expression or Event Frame generation). At the ...
Timur Eroglu almost 2 years ago in AVEVA™ Adapters / AVEVA Adapter for OPC UA 1 No status

The Adapter framework needs to be able to perform scaling on raw data

Many users want to use Adapters for the nre abilities they offer versus Interfaces: Support for containers, Linux, edge deployment, new failover and fault tolerance, integration with CONNECT Data Services, etc. HOWEVER, many sites use Interfaces t...
Daniel Lopez 5 months ago in AVEVA™ Adapters / AVEVA Adapter for DNP3 1 Future consideration

PI Adapter for AspenTech IP21

We have customers who are using AspenTech IP 21 and would like to have data replicated in both PI DataArchive and OCS in the future. Since the PI Interface is a bit outdated, a new PI Adapter would make perfect sense (since there is already a PI C...
Guest over 3 years ago in AVEVA™ Adapters / New Connectivity 4 Tell us more

Automatically add new attributes to existing views

As a PI administrator I want the integrator to detect new attributes on a template and add them to existing views automatically. This would be easier than creating a new view and asking users to reference this new output.
Guest over 3 years ago in PI Integrators / General 3 Declined

Classic Mode for Adapters

One of the big issues we have with adapters (outside of the lack of write capability) is not having the same control over creating and editing tags that we have with PI interfaces. As we talked about the adapter automatically creates PI tags or us...
Brian Rock over 2 years ago in AVEVA™ Adapters / General 5 Future consideration

Allow users to modify existing views

Currently, it is not possible to modify an existing view in the PI Integrator. End users would like to be able to modify an existing view and reuse the same table name. The end user should have the option to choose whether or not the view should ...
Guest over 3 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 1 Completed