Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 23

Support for the Galileosky Protocol

Need an option for direct integration of Galileosky GPS tracking devices with the AVEVA PI System without third-party middleware. The devices primarily use the proprietary Galileosky binary protocol (TCP-based, port 20332 by default) for real-time...
Mohammed Qasim Asghar 13 days ago in AVEVA™ Adapters / New Connectivity 0 No status

Be able to export data to excel with an option to enter/select time intervals

After creating a multidisplay, would it be possible to export the multidisplay data to excell spreadsheet with an option to choose time interval?
Guest about 2 months ago in AVEVA™ RtReports / General 0 No status

Enable Including Event Frames in Time Based Report

It would be useful to have the possibility to include EFs in a Time Based Template. For example: - if downtime events are recorded as Event Frames, I would like to report on all the downtime EFs occurred in the last month (for example), includin...
Guest over 3 years ago in AVEVA™ RtReports 2 No status

Properly link comments, verifications and approvals to batches

When Unit Procedure level criteria are used to link a report template to batches, it is possible to select any Unit Procedure, Operation, Phase or step to generate the report. Whatever the selected Unit Procedure, Operation, Phase or step, the ge...
cmartineau almost 3 years ago in AVEVA™ RtReports / Generator 0 No status

Allow configuration of Trend legend position

As an report designer, I would like to be able to choose the position of the legend on Trends.
Guest over 3 years ago in AVEVA™ RtReports 0 No status

PI Adapter for EtherNet/IP

Develop a PI adapter to talk directly to Rockwell PLCs using EtherNet/IP without requiring an OPC UA server.
Steve Boyko over 3 years ago in AVEVA™ Adapters / New Connectivity 1 No status

Automatically generate official print after batch completion

Customer would like to be able to automatically generate an official PDF printout at the completion of a batch or at the end of time-periods for time based reports. In the case where MES systems are used, some customers merely need to attach an o...
Guest over 3 years ago in AVEVA™ RtReports 0 No status

PI adapter for PI-to-PI

We need a new robust product to support data transfer between PI servers in separate domains (operational network --> business network). This product would need to support the following: Highly available remote management/deployment multiple in...
GaryYegiazaryan over 2 years ago in AVEVA™ Adapters / New Connectivity 3 No status

REST API data source

e.g.: weather forecast, 3rd party
Guest almost 3 years ago in AVEVA™ Adapters / New Connectivity 0 No status

Prevent an user from approving more than once

When a report has multiple approval cycles with the same group (or with different groups that have some people in common), it would be useful to have the option of preventing the same user from completing all approval cycles, so that they must be ...
Guest about 3 years ago in AVEVA™ RtReports / Generator 0 No status