Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 79 of 5194

Would like to have data export functionality from ad hoc displays

No description provided
Guest over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 1 No status

Use Both AF Element Attribute and PI tag in a Calculation

Currently I can have a calculation that is made of Only AF Elements Attributes OR PI Tags. It would be nice to have the ability to create calculations that can use both Attribute values and Tag values
Guest over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

PI ICU should not allow PItoPI COLD failover configuration

As of version 3.8.1 COLD failover is no longer supported by the PI to PI Interface (https://techsupport.osisoft.com/Troubleshooting/Enhancements/19255OSI8). However, the PI Interface configuration utility still allows COLD failover to be selected....
Guest over 3 years ago in PI Interfaces / PI to PI Interface 0 No status

Source and destination tag mapping list

Customer would like the ability to have PItoPI create a list of tags that includes the FULL name of the source tags, as well as the destination tags they are mapped to.  This will greatly assist in managing tags that are being sent to a remot...
Guest over 3 years ago in PI Interfaces / PI to PI Interface 0 No status

Create function / calculation with custom time interval (not just "past 30 days")

Customer frequently utilizes PI Vision calculations but sees a gap with time ranges. They would like the ability to choose precise dates for their functions and calculations, not being limited to pre-set ranges.
Matthew Del Bonta over 2 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Enable the ability to use the UserInt1 to propagate PI to PI APS source tag name changes to the target if source collective Data Archive-level failover is configured

UserInt1 attribute contains source point ID. (Illegal configuration if source Data Archive-level failover is configured.) Source tag mapping by point ID is not compatible with Data Archive-level failover.
Guest over 2 years ago in PI Interfaces / PI to PI Interface 0 No status

Supress PI-APS messages for Error -2147220428: Failed to create point on server. [-10550] Tag Already Exists in Table

Seeing "information" messages in PI-SDK related to "Error -2147220428: Failed to create point on server. [-10550] Tag Already Exists in Table" which is irrelevant to see in the logs. If one source instance sending to multiple destination instances...
AshwinC over 2 years ago in PI Interfaces / PI to PI Interface 1 Future consideration

Change the tooltip behavior for asset-based calculation to differentiate from AF Attribute paths

Currently, when hovering over a symbol that displays a PI Vision asset-based calculation, the tooltip that represents the calculation "path" has the same nomenclature/format as an AF attribute. In this case, the format is < Path to AF Element w...
Luis Camacho Forero about 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Show calculation inputs with a single action when viewing the calculation result

If one is viewing a calculated value on a trend, for example, it would be helpful to take one step to see the values behind that calculation for troubleshooting purposes.
Guest over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 Declined

Create PI ProcessBook Support Tool add-in to replace data sets in PB displays with other data references before migrating to PI Vision

As described in PI System Analytics: Which tool is best for the job? (https://customers.osisoft.com/s/knowledgearticle?knowledgeArticleUrl=KB00868), OSIsoft recommends using asset analytics instead of PI Calculation data sets to create calculation...
Jeremy Roberts over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 Declined