Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Bulk update AF Attribute paths in PI Vision Symbols when AF path and GUID have changed

As a user, I would like to have an efficient method or utility to easily update AF paths for PI Vision symbols in bulk when the AF path and GUID have changed (for example, when attributes are moved to a new location in a new AF Database).
Patrick Atchley over 3 years ago in AVEVA™ PI Vision™ / AF Integration 0 No status

Assign units to tag-based calculation

When creating a tag-based calculation, allow the user to set unit of measure through a text field. The units can then be displayed within symbols on the main display.
Amit Dutta almost 4 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Configuring multi-states is tedious and time consuming. There should be a more efficient way.

As an example, for a certain kind of pressure measurement, the ranges and colors for multi-stating will always be the same, regard less of the type of symbol. It would save a lot of time if "known multistate configurations" could be applied like a...
Laurie Dieffenbach over 1 year ago in AVEVA™ PI Vision™ / Authoring Displays 1 No status

Version control for selected PI Vision Displays

Allow PI Vision administrators to mark selected displays as "Version Controlled" and keep revisions.. With the ability to revert to prior versions. This would also track the editor of each version. I don't think this should be a default or user op...
Martin Bryant over 3 years ago in AVEVA™ PI Vision™ / Administration 0 No status

Expand options under the Label (or Legend Label for trends) dropdown to include Instrument Tag.

It would be helpful to add more options under the Label (or Legend Label for trends) dropdown to include InstrumentTag and other tag attributes. Currently, the options for tags are name, description, or custom (free text) It would be great to incl...
Bryan Klosiewicz about 1 year ago in AVEVA™ PI Vision™ / Symbols 0 No status

User Input Symbol

It would be great if there was an AVEVA supported (not custom) "User Input" symbol, for numeric data that could be referenced and used in other symbols' calculations. E.g. If the user puts 2 into the "User Input" text box, the calculation in a tre...
dave sims about 2 years ago in AVEVA™ PI Vision™ / Symbols 1 No status

Support Multiple Element-Relative Assets in Calculation

Currently, you can only have one relative asset (e.g., FD1) in your calculation. Any other assets' (e.g., FD2, FD3, FD4) attributes added will have a direct path. This means a calculation can't support multiple assets being switched, even though P...
Kelsey Bobeck 4 months ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

PI Manual Logger’s Conditional Manual Data Entry feature should allow conditions based on tags that are not part of the tour

Tags within the tour may require data entry based on the value of status tags for which data is never entered manually. Use Case: Say there is an asset called Pump1 that has many related tags (e.g. Pump1.FlowRate, Pump1.Pressue, Pump1.PowerConsum...
Guest almost 4 years ago in AVEVA™ PI Vision™ / Manual Data Entry / PI Manual Logger 1 Declined

Re-size ProcessBook display during migration to PI Vision

Some PI ProcessBook displays migrated into PI Vision are too large to fit into the screen size even when using Fit All or zooming out to the maximum due to hardcoded maxScale. We would like to be able to re-size the display (including all symbols...
Guest almost 4 years ago in AVEVA™ PI Vision™ / ProcessBook Migration 1 No status

Upload ProcessBook display file to Coresight

The current mechanism to add ProcessBook displays is to copy them to a shared drive. Unfortunately our IT like many (I actually agree with them) don't particularly like opening firewalls for the Windows file share. An easy solution would be to pr...
Guest almost 4 years ago in AVEVA™ PI Vision™ / ProcessBook Viewer 0 Declined