Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

AVEVA™ PI Integrator for Business Analytics

Showing 203

Add Indexes to SQL targets for better performance

The Integrator continually performs SELECT statements on the target table, which can take an extremely long time as the table continues to grow. Indexes are needed on the table created by the Integrator in order to keep performance acceptable.
jcox about 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 No Status

Improve writer performance to Amazon Redshift for views with multiple shape matches

Currently, PI Integrator for Business Analytics takes much longer time to write to the Amazon Redshift target for views with multiple matches. For below example, View 1: 1 shape match with 300 rows of data View 2: 300 shape matches with 1 row of d...
Ting-Ying Chung over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 No Status

Improved sending of data from pi integrator to kafka

It is proposed to improve performance in sending data to the destination kafka. The backfilling and update data have been greatly delayed with respect to the previous version to 2020 R2 P1, which sends 30 messages per second, and the previous 7000...
SheilaG over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 No Status

Allow sending data to Apache Kafka target in XML Format using the PI Integrator for Business Analytics

It might be necessary to send data to Apache Kafka target in XML, because Consumers might need the data in XML format (altough it can be considered outdated). This would avoid the necessity to convert the data from JSON to XML as an additional ste...
Julian Baur over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 No Status

"Start Time" and "End Time" of a view reflect the data the view contains.

As someone who uses the UI to get a summary of what my views contain, I would like the view's "Start Time" and "End Time" to reflect the actual data contained within the view in the case that I "Update Data" in the view to be something outside of ...
Guest over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 Declined

Always produce output table on publication: if there is no data to export when an asset view is published, produce an empty output table

I build asset views on a schedule with interpolated time points based on a PI Point. I also set these up before any data is added to the PI Point so on first publication there is no data to export. Currently the PI Integrator for Business Analytic...
Guest over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 Declined

BI Integrator preserve Column Configuration on Filter Change

When you copy a BI Integrator Job ans change some settings in the Filter all attributes are added to the column view. We remove Attributes that are not needed e.g. Level1 Attributes when we only Need the Level2 Child Attributes. On a change the...
Guest over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 Declined

Allow for sampling rate that is faster than one event per seconds

High frequency data is increasingly common. With examples in manufacturing of events happening entirely within a few 100s of milliseconds. The request is to allow the export of interpolated data at a rate higher than the current limit of 1 event p...
Guest over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 1 Declined

Automatically remove data from continuous views

As an engineer using PI View or SQL writers for a report, I would like option to remove data older than a certain cutoff. For example, a continuous view is used to generate data for a report on the last 8 hours. Data older than that are no longer ...
Guest over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 8 Tell us more

Add ability to export stored Events for Event-based analysis, not only interpolated

Currently we can export PI data using a given interval, returning evenly-spaced rows of data. However, for some uses i need to have the original events stored in PI, not interpolated. E.g. i need to create a report that contains every value tha...
Guest over 1 year ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 6 No Status