Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 4912

Send notification to next approver-group in approval cycle

Provide the possability to send notifications based on the approval-cycle status of the report. For example: In a "two-steps" approval cycle, send a notification to the final approval group when the first group approved the report.
Guest over 2 years ago in AVEVA™ RtReports 0 Declined

Prevent Analysis calc failure for attribute not found

If the same analysis is trying to be used for multiple templates, there will be times when some attributes are not available from a template - this will cause the analysis to fail. Even when the difference in attributes is known and attempted to b...
Dan Benedict 5 months ago in AVEVA™ PI Server / Asset Framework (AF) 0 No status

Detect and monitor which OPC UA server the PI Adapter is connected to

When configuring a PI Adapter to leverage server-level redundancy, it is not currently possible to monitor which server instance the PI Adapter is connected to. Surfacing this information would allow server administrators to better monitor the hea...
Giulio Cattarin over 1 year ago in AVEVA™ Adapters / AVEVA Adapter for OPC UA 3 Future consideration

provide datalink add-in functionality in WPS spreadsheet(WPS office)

WPS office is widely used for China customers, a significant number of local PI customers' company have WPS office instead of Microsoft office and they can't get benefit from the Datalink for now. Datalink add-in in WPS office will help them a lot.
Emily Ni about 1 year ago in AVEVA™ PI DataLink™ / Functions 1 No status

Number Formatting for Percentages %

It would be helpful to have a number format for percentage if the data is in decimals. The only work around is creating a calculation to multiple the number by 100. %
Chiara DeLuca 5 months ago in AVEVA™ PI Vision™ / Symbols 0 No status

Integrating/Linking Values Between Symbols

It is requested to have the ability to integrate/link selected items between symbols. An example use case could be an Alarm event display table symbol that is linked to a displayed trend symbol and will select/highlight the corresponding trend lin...
Amber Athon 5 months ago in AVEVA™ PI Vision™ / Symbols 0 No status

Edit PI Vision PI tag references in a text field

Searching for and dragging and dropping a new PI tag reference takes much longer than right-clicking and editing the tag name. Can PI Vision be designed to follow the historical PI Processbook design where the tag name reference was a text-editabl...
emetzler about 2 years ago in AVEVA™ PI Vision™ / Display Management / Displays Page 1 No status

Add PSE data trending options to PI Datalink Tag Search

In PI System Explorer users are able to search tags and then immediately launch windows showing "Time Series Data", "Trend" or "Add to Trend", which makes it really easy to explore data and figure out what the right tags are that you're looking fo...
Steven.Taylor over 1 year ago in AVEVA™ PI DataLink™ / Search 0 No status

Write back to source system

OPC UA PI connector to have a feature to write back data to the source system. Example Watchdog data
Navanita about 2 years ago in PI Connectors / PI Connector for OPC UA 0 No status

Sort Events Table on multiple columns

We would like to be able to sort events tables by more than one column. One example use case would be where we review a list of events that includes their start times, start dates, and a numeric summary value associated with the event. We would li...
Gregory Malek 8 months ago in AVEVA™ PI Vision™ / Events (EF) 0 No status