Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 5209 of 5209

Be able to favorite a whole book instead of just individual displays

currently unable to favorite a whole book of displays another person created that is commonly used by others at the site.
Guest over 2 years ago in AVEVA™ PI Vision™ / Display Management / Displays Page 0 No status

Allow Search Root of Vision Collection to be Asset Relative

The Search Root for a Vision Collection is a static Asset. My suggestion is that the Search Root should accept an Element Template. In this way, the Collection can respond to switching of the display asset context.
kliffhopson over 2 years ago in AVEVA™ PI Vision™ / Authoring Displays 0 No status

Add Continue() Function To Asset Analytics

Similar to the Exit() function, a Continue() function would be very helpful in reducing the calculation load on my analysis service, in this case by not fully executing variables if a condition is true. For example, if I'm evaluating the state of ...
Kelsey Bobeck over 2 years ago in AVEVA™ PI Server / Analytics & Calculations 0 No status

Remove the Prerequisite Kits from "PI Server → Data Archive" and from the "Current Version" tab

To my knowledge, the Prerequisite Kits are not needed by any supported PI program since any prerequisite programs would be included in the install kit of each PI program. The Prerequisite Kits are just unnecessary clutter at this point. Please rem...
Kenneth Barber over 2 years ago in Customer Portal & PI Square / Product Downloads 0 No status

Create function / calculation with custom time interval (not just "past 30 days")

Customer frequently utilizes PI Vision calculations but sees a gap with time ranges. They would like the ability to choose precise dates for their functions and calculations, not being limited to pre-set ranges.
Matthew Del Bonta over 2 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Ability to customize the icon of the Target Indicator (default is a triangle)

Given the existing target indicator feature in PI Vision: It is currently limited to only use a triangle graphic/icon/shape. It would be nice to be cable to choose various shapes/graphics for the indicator, or even be able to use a custom graphic ...
Guest over 2 years ago in AVEVA™ PI Vision™ / Symbols 0 No status

Add option for PI System Connector to replicate Annotations

Users who would want to synchronize all the data from the source PI System to Destination PI System would also need Annotations to be replicated as well. Currently the PI System Connector does not support Annotations and the request here would be ...
Nico C about 1 year ago in PI Connectors / PI System Connector 0 No status

Fetch previous change of value (and its timestamp) from compressed data

It is valuable to extract the previous change of value and its timestamp without full dump of compress data. If that value could be specified, the feature is even more usefull. Example: a time series has the state of an alarm and the current value...
Guest over 2 years ago in AVEVA™ PI DataLink™ / Functions 0 No status

Configure PI Interface for Emerson-Ovation to read drop status points Ovation.

knowing in real-time if an ovation server is down and would help with maintaining the PI server.
Betty about 1 year ago in PI Interfaces / Other Interfaces 0 No status

Add the option to set the Event Frame output to be the value of a string attribute with the longest time-span over the Event Frame Duration.

I have an Event Frame string attribute that changes its value over the duration of the Event Frame. I'd like to have the option to set the Event Frame output to be the value of the string attribute with the longest time-span over the Event Frame D...
Dave Tayler about 1 year ago in AVEVA™ PI Server / Event Frames (EF) 0 No status