Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

AVEVA™ PI Vision™

Showing 1723

Page within a page.

The ability to open a PI Vision page within a PI vision page would cover a lot of needs at one time. The parent page could house a menu of links across the top or side. The Child page would open within a "box" inside the parent page based on links...
Guest 3 months ago in AVEVA™ PI Vision™ / Authoring Displays 0 No status

Provide custom time scale for individual trend plots within Display

Currently it's only possible to define time range i.e. *-8h for all trend plots simultaneously.If Display consists of multiple plots there should be ability to set individual time for each plot. (see attached picture as example)This very simple fu...
Evgeny Fedorov 10 months ago in AVEVA™ PI Vision™ / Look & Feel / Styling 0 No status

CSV-002 valve position does not reflect actual plant status

PI Vision page 442 for Containment Spray CSV-002 does not match what actual plant status in for All 4 Units. All 4 Units have the valve OPEN but it shows CLOSED.
Guest 5 months ago in AVEVA™ PI Vision™ / Display Management / Displays Page 0 No status

Increasing Size of CSV Export File

Currently, when exporting any display to a CSV for manipulation via Excel, I've noticed that the number of objects (rows) recorded for this file cannot exceed 3600, even when further data is requested for export. Is there a way to change this?
Guest about 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 1 No status

Correct existing values

Our customers are often asking for a way to manually correct the existing data. They expect to have a table view of all archived values with timestamps during a certain period of time with capability to change the value and enter a comment.
Guest over 2 years ago in AVEVA™ PI Vision™ / Manual Data Entry 1 No status

PI Manual Logger’s Conditional Manual Data Entry feature should allow conditions based on tags that are not part of the tour

Tags within the tour may require data entry based on the value of status tags for which data is never entered manually. Use Case: Say there is an asset called Pump1 that has many related tags (e.g. Pump1.FlowRate, Pump1.Pressue, Pump1.PowerConsum...
Guest over 2 years ago in AVEVA™ PI Vision™ / Manual Data Entry / PI Manual Logger 1 Declined

Upload ProcessBook display file to Coresight

The current mechanism to add ProcessBook displays is to copy them to a shared drive. Unfortunately our IT like many (I actually agree with them) don't particularly like opening firewalls for the Windows file share. An easy solution would be to pr...
Guest over 2 years ago in AVEVA™ PI Vision™ / ProcessBook Viewer 0 Declined

Allow editing of PI Vision display start/end time stamps on mobile device

Allow editing of start/end absolute time stamps when viewing PI Vision display on mobile device (iPod, iPhone, etc.). Currently, start and end time stamps (e.g. 2-Aug-2017 11:30:00) of the displayed data can be edited when viewing a PI Vision disp...
Guest over 2 years ago in AVEVA™ PI Vision™ / Mobile: Phone 0 Declined

Report of the Admin page should show initial load performance of the display

PI Vision should make use of the corresponding SQL Server to store performance indicators to be trended afterwards in the PI Vision Admin page. This would be relevant especially with duration of initial load of the page --- like when hitting F12...
Guest over 2 years ago in AVEVA™ PI Vision™ / Reporting 0 No status

Start/End/Duration in Gantt Chart

Need the ability to see start/end time and duration when hovering cursor over event frames in the Gantt chart (process book currently has this functionality)
Guest over 2 years ago in AVEVA™ PI Vision™ / Event Comparison Displays 0 No status