To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

Trend: Regression line

Support for a linear regression lines on trends, similar to what was available in PI ProcessBook.
  • ADMIN RESPONSE
    Mar 21, 2025

    This item is planned for the upcoming PI Vision 2025 release.

  • Attach files
      Drop here to upload
    • Athanasios Kitsios
      Reply
      |
      Feb 4, 2025

      You could consider the following options when user adds a trendlines based on five models:

      • Linear

      • Logarithmic

      • Exponential

      • Polynomial (with user-defined Degrees)

      • Power

      Also consider:

      • Allow a trend line per colour (attribute)

      • Show/hide confidence bands (90%, 95% 99% confidence intervals for each model)

      • Force y intercept through zero

      • Option to include other attributes as factors within the model

      • Show a recalculated line for highlighted/selected data points

      • Show tool tip with the Exact Formula with parameters used, the ‘R-squared’, the ‘P-value’, and options for Edit, Format and Remove.

      1 reply
    • Ku Muhamad Ashman Ku Aziz
      Reply
      |
      Feb 4, 2025

      Sharing my experience as PI Engineer, our users from engineering team used the regression line to do forecast based on the regression line and when the parameter/attributes will reach certain limit. So, it will be useful if there is also a feature that can include limit and determine the time to reach the limit. For example, determine the lube oil level and when to top-up.

    • Semavi Terzi
      Reply
      |
      May 27, 2024

      gonna suggest this suggestion for also AF analytics

    • Guest
      Reply
      |
      Aug 18, 2022
      ProcessBook's linear regression able to change based on the time-range selected (on-the-fly) and can also predict for future (which is useful for us to predict fouling), this is not achievable through PI Vision.
    • Victor Cunha
      Reply
      |
      Aug 18, 2022
      Any updates on this? Shouldnt be really complex change as it is already available for xy trend