Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 105

Add the function/calcultion of "Moving Average" for PI Tags

The ability to create an average calculation is within PI Vision, but it doesnt do moving average. You can set custom timing intervals (eg. every 5 min etc.) but what about a 5 min moving average that has a continuou data points for a trend. A wor...
Mitchell Davidson over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

MarkArchiveGaps tuning parameter description should be more descriptive

The description for the MarkArchiveGaps tuning parameter for a value of 2 is unclear. A user might interpret: 2 - Gap markers only when there is an actual gap between two consecutive archives. to mean that markers are shown when a tag does not h...
Guest over 3 years ago in AVEVA™ PI Server / System Management 0 No status

Dynamic inventory of PI System components

Provide a way to have an online, dynamic inventory of installed PI System components, especially interfaces.
Guest over 3 years ago in AVEVA™ PI Server / System Management 0 No status

Remove the PI Interface Configuration Utility (PI ICU) from the PI System Management Tools (PI SMT) install kit

PI System Management Tools is more of a client-side program, so it does not make sense for it to be packaged with a server-side program like the PI Interface Configuration Utility. This increases the size of the install kit, increases the extracti...
Kenneth Barber over 3 years ago in AVEVA™ PI Server / System Management 1 No status

Possible to use a Calculated variable into a new Calculated value like a "Tag"

No description provided
Guest over 3 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Time range configurable to attribute value

Allow the time range (either start time or end time or both) in Pi Vision to reference an attribute value. This would allow data to dynamically update according to an event. For example, I want to see a list of batch information (start time, end t...
Guest over 1 year ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Rate of change calculation is required for analysing points

Rate of change calculation is required for analysing points, especially steam parameters like temperature and pressure. This is required for fatigue analysis. For a selected time frame, the following four calculations will be required: 1) Maximum ...
AK over 2 years ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

in point builder remove the ability to delete pi point on right click.

Remove the ability to delete pi point on right click in PI SMT Point Builder Put this function elsewhere
Guest over 3 years ago in AVEVA™ PI Server / System Management 10 No status

Pre-installation system wide compatibility check

As a system administrator, I would like a comprehensive tool to validate system and version compatibility across my entire PI system.  When performing upgrades / adding components to my PI infrastructure, it takes considerable time to comb th...
Guest over 3 years ago in AVEVA™ PI Server / System Management 1 No status

Sizing sheet should include at least minimal support for AF Audit Trail

Currently there is not a single hint nor guidance on the impact of the Audit Trail in the sizing sheet, while the Audit Trail can have a major impact on the storage requirements.
Guest over 3 years ago in AVEVA™ PI Server / System Management 0 No status