Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

AVEVA™ PI Vision™

Showing 1891

Configure additional or custom fonts as options for PI Vision symbols

While PI Vision 2024 has introduced the ability to select different fonts to use in PI Vision symbols, there are only a handful currently available (Arial, Bahnschrift, Cascadia Code, Roboto, Roboto Slab, Tahoma, Times New Roman). We would like th...
Jason Lu over 1 year ago in AVEVA™ PI Vision™ / Look & Feel / Styling 0 No status

Event Frames Table & Features enhancements

• The ability to view event frame attributes/annotations (or referenced element attributes) within the Events table in PI Vision • Select multiple events in the table and define a reason code and/or comment for all events selected • Input/View com...
Guest over 3 years ago in AVEVA™ PI Vision™ / Event Comparison Displays 6 No status

Allow Units of calculations to be used in displays, not only on top but to the right, left or below.

A tag is giving a simple calculation e.g. TAG_MW * 1. But the calculation has no where to specify the engineering units and it also does not derive that MW * 1 will still be MW. When you place this on the diagram you cannot place the units to the ...
Guest 3 months ago in AVEVA™ PI Vision™ / Analytics / Calculations 0 No status

Option to change orientation of Bar Chart labels

Currently the Bar Chart labels are fixed to appear horizontally. When using the vertical orientation option, this often results in having to make the symbol quite wide to be able to render the entire label for each bar. It would be nice to have ei...
Miwa Teranishi about 2 months ago in AVEVA™ PI Vision™ / Symbols 0 No status

PI Vision home page load time

Improve the timing for PI Vision home page first load, for large amount of diplays.
Eduardo Miller about 2 years ago in AVEVA™ PI Vision™ / User Experience 0 No status

PI Vision - Configurable step factor for Time bar navigation

Current behaviour and issue Today’s step buttons (arrows) move according to the full bar duration time, which I find inconvenient in most cases. For me, it would make more sense if each step shifted by half of the displayed duration, when moving f...
Oerjan Sikveland 3 months ago in AVEVA™ PI Vision™ / User Experience 0 No status

Multiple Trace Colors for Pinned Event Frames

If there are multiple pinned event frames in a Event Frame Comparison Display, each pinned trace should have a different color
Guest over 3 years ago in AVEVA™ PI Vision™ / Event Comparison Displays 6 No status

Search for assets by attribute value

User Story: Search for assets by attribute value: As a process engineer, I want to retrieve assets of a particular type by specifying an attribute value like Production SO THAT I can find the specific assets that I'm looking for. For example, fi...
Guest over 3 years ago in AVEVA™ PI Vision™ / Search 3 No status

Add ability to Collapse/Expand Attribute category sections in Asset Search Pane

By default, the attributes shown for an asset in the Asset Search Pane, are all shown under their categories with no ability to collapse a given section. The can mean that the user has to scroll down a considerable amount in order to find the attr...
Guest over 3 years ago in AVEVA™ PI Vision™ / Search 5 No status

Event (EF) Plot / Batch SQC Plot

Plot for Events (EFs) or Batches are on the x-axis and process value is on the Y axis. This might be another variant of a SQC Plot but based on batches/events (in time order) rather than strictly by time.
Guest over 3 years ago in AVEVA™ PI Vision™ / Symbols 2 No status