Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 648

Min/Max Timestamps

Need Timestamps for Minimum and Maximum values in Table
Rebekah@SCG over 3 years ago in AVEVA™ PI Vision™ / Symbols 2 Declined

XY Plot: Logarithmic scales for both axes

It would be useful to be able to implement a logarithmic scale to either/both axes of xy plots.  Specific use case: Diagnose well conditions in real time by looking at conditions based on elapsed time since an event frame.  To be able ...
Guest over 3 years ago in AVEVA™ PI Vision™ / Symbols 1 Declined

Support manual data entry of future tag data in real time

Manual data entry users want to write forecast data (e.g. 1 month into the future for tags belonging for many sites/assets) without the data being queued for sending.
Guest over 3 years ago in AVEVA™ PI Vision™ / Manual Data Entry 2 Declined

Change Time Range Defaults

Add custom time range defaults. Shifts at my organization are 12 hours, I would like to allow my users to be able to select 12 hours without having to type in the timestamps manually.  (As opposed to or in addition to 1h, 8h, 1d etc.)
Bethanne Robinson over 3 years ago in AVEVA™ PI Vision™ / Administration 1 Declined

Allow option to prevent trend interpolation after the most recent data value

Currently, trends interpolate a line after the most recent data value--which means that if the last value occurred two hours ago a flat line will be drawn on the trend from the last value until now, which can erroneously give the impression that d...
Guest over 3 years ago in AVEVA™ PI Vision™ / Symbols 2 Declined

Ability to change image/graphic based on a data item's value

Hi there, Please add a feature for "MultiState Graphics" This would be a simple feature where if a value for a tag or asset was equal to something then the image would change. An example of this would be if you had an image of a moving turbine ...
Guest over 3 years ago in AVEVA™ PI Vision™ / Symbols 0 Declined

Continue to support/modify the PI Trend Add-In for Excel DataLink that was in 2014 on into 2016 and beyond.

This add-in allowed for a trend to be created within an Excel Spreadsheet without first dumping the data to the sheet.  It was an easy trend to make and it updated with current live data when requested (F9). There is a work around to get thi...
Guest over 3 years ago in AVEVA™ PI DataLink™ / Functions 8 Declined

Provide a way to share display URLs via auto-generated email

Provide a way to send an email from a display that includes a URL to that display. Provide a way to multi-select displays on the home page and send the URLs of those displays in an email.
Ryan McErlean over 3 years ago in AVEVA™ PI Vision™ / Sharing & Collaboration 0 Declined

Ability to edit some PI-AF properties from PI Coresight, i.e.: Light-weight PSE

PSE is often used as a client-tool where it is not intended to be. It would be very beneficial to have a simple PSE tool just to view data. Browse Element Hierarchies and view Attributes, EventFrames. Just like PSE. The hierarchy could also make a...
Guest over 3 years ago in AVEVA™ PI Vision™ / AF Integration 3 Declined

Support of more than 1 reason code

As a user, I would like to enter more than 1 reason code per event frame. For example, a downtime event frame is created for the whole production line, and I would like to have a reason code for the cause and the other for the equipment. Currentl...
Willy Seah Wei Liat over 3 years ago in AVEVA™ PI Vision™ / AF Integration 5 Declined