Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 47 of 5194

Include Annotations of Event Frames into Event Views

Customer would like to do Batch reports in BI Tool and Annotations contain important information, like Operator comments, reasons for changed values etc.
Guest over 3 years ago in PI Integrators / General 4 No status

PI Integrator does not consistently sample the data at 2:00 AM during the DST change.

If we configure a view to sample an average data once a day at 2:00 AM, the sampling time will shift by one hour after the DST change. This impacts our calculations because the timestamps are recorded at 1:00 AM after the DST change. We want the d...
Ahmad Fitri BIN ROSLAN about 1 month ago in PI Integrators / General 0 No status

Allow "PI View" target to be disabled

I would like the option to remove or disable the "PI View" target on the Data Warehouse, Azure, and SAP Hana editions.  In these editions, the PIIntegratorDB is expected to remain small because the data is published out to a separate databa...
Guest over 3 years ago in PI Integrators / General 1 No status

PI to Maximo integration

When PI is used to gather equipment sensor information but Maximo is used for asset management, it would be helpful to have a simple way to get equipment information out of PI and into Maximo.  This would be useful for scheduling preventative...
Guest over 3 years ago in PI Integrators / General 4 No status

Automatically add new attributes to existing views

As a PI administrator I want the integrator to detect new attributes on a template and add them to existing views automatically. This would be easier than creating a new view and asking users to reference this new output.
Guest over 3 years ago in PI Integrators / General 3 Declined

Wonderware connector to store Bad/Questionable data from the WW Historian and flag as System Digital State (for example Bad Input, Bad etc) in the same Value PI Tag

As of the connector version 1.6.9.14, we can choose to store the Quality from the Historian in a separate Quality PI Tag (on top of the value PI Tag). Bad quality value is not being stored nor flagged in the Value PI Tag but this can be captured i...
Ee Sheing Lee over 2 years ago in PI Connectors / PI Connector for Wonderware Historian 0 No status

PI Connector for Wonderware Historian should be configurable to use 'FULL' mode query

The connectors should have a standard behavior. We believe the Wonderware connector should be collecting data in the same way as the Cygnet connector by getting all the data stored in the source historian irrespective of the value change. Currentl...
Guest over 3 years ago in PI Connectors / PI Connector for Wonderware Historian 0 No status

Wonderware Historian Connector should store some metadata in PI tag attributes

The Description, Maximum EU, Minimum EU, Engineering Units, etc. that are stored in the Wonderware historian should be stored in the PI tags' attributes as well as the Wonderware AF structure.
Guest over 3 years ago in PI Connectors / PI Connector for Wonderware Historian 1 No status

Improve the UI to allow the starting/stopping of multiple views at once.

There are a variety of reasons why being able to handle views in bulk would be nice. If I am cleaning up the UI it would be easier to delete multiple views at once. If I am doing maintenance on a target and I want to stop a subset of views, then I...
Guest over 3 years ago in PI Integrators / General 0 Declined

Validate credentials before running connector

Need a way to easily confirm that the credentials are correct before I try and run the connector.  Would like to see any errors surfaced via the web page so I can troubleshoot.
Guest over 3 years ago in PI Connectors / PI Connector for Wonderware Historian 0 No status