Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

EdgeCmd "add" data selection with CSV

At the moment the EdgeCmd data selection with a file path is limited to get and set. This means that to perform an update the data selection needs to be exported, modified, and the imported. It would be a great time saver to be able to provide a s...
Mike Horrocks over 1 year ago in AVEVA™ Adapters / General 0 Future consideration

The PI Integrator for Business Analytics should support data retention for continuously published views

Currently the PI Integrator for Business Analytics does not have a feature that would automatically delete older data from existing scheduled views. As a piadmin, I would like a feature to be added so that the integrator can be configured to updat...
Bethany Jewett almost 2 years ago in PI Integrators / AVEVA™ PI Integrator for Business Analytics 0 No status

Provide custom time scale for individual trend plots within Display

Currently it's only possible to define time range i.e. *-8h for all trend plots simultaneously.If Display consists of multiple plots there should be ability to set individual time for each plot. (see attached picture as example)This very simple fu...
Evgeny Fedorov almost 3 years ago in AVEVA™ PI Vision™ / Look & Feel / Styling 0 No status

Support URN in addition for URI for OPC UA Server redundancy

As stated in the documentation "Some OPC UA servers use URNs instead of URLs, which is not currently supported by this adapter.", adding support for URNs would increase the servers the adapter is compatible with.
Mike Horrocks over 1 year ago in AVEVA™ Adapters / AVEVA Adapter for OPC UA 1 Tell us more

option to not collect quality

Quality is not supported by the OPC UA Server/always zero.
Guest over 2 years ago in AVEVA™ Adapters / AVEVA Adapter for OPC UA 1 Tell us more

PI DataLink installation: Do not require permission changes on registry keys

The registry key permission changes in this KB https://customers.osisoft.com/s/knowledgearticle?knowledgeArticleUrl=DataLinkregistryediterror-PISDKAccessDenied should be applied by the PI DataLink installer. It is not normal that software needs ma...
Peter Belmans almost 3 years ago in AVEVA™ PI DataLink™ / Installation & Upgrading 3 No status

Allow Dynamic Ranges on Graphs Based on Attributes in Event Frame

My event frames contain a list of attributes that state when different steps in a process start. They are in the correct time format for PIVision. I want to be able to build a dashboard that has multiple grahps and assign the start and end times f...
Guest almost 2 years ago in AVEVA™ PI Vision™ / Events (EF) 0 No status

The DNP3 Adapter should support group 40

The interface supports this group. The Adapter does not (see https://docs.aveva.com/bundle/adapter-for-dnp3/page/1231146.html). It is essential that the Adapter have this identical feature as the interface, to allow it to read the same data and be...
Daniel Lopez 11 months ago in AVEVA™ Adapters / AVEVA Adapter for DNP3 0 No status

Add functionality to PI Vision migration tool to auto convert buttons to links

Hello, PI Vision no longer supports buttons, but rather uses links, meaning that after migration, all buttons cease to function. Currently the only option available seems to be manually converting all buttons to links post migration. Is adding an ...
esb_support almost 3 years ago in AVEVA™ PI Vision™ / ProcessBook Migration 0 No status

Toggle trends in PI Vision to stepped data

End-Users want the functionality in PI Vision to switch between how data is trended on the fly. Sometimes they want to quickly change data to stepped and then back for review. Other visualizion software has this functionality. Converting from IP21...
PriceN almost 4 years ago in AVEVA™ PI Vision™ / User Experience 0 No status