Skip to Main Content
AVEVA™ PI System™ Feedback Portal

Welcome to our feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas and comments are visible to all other users.


This page is for feedback specifically for AVEVA PI System. For links to our other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 4921

Include Modified Timestamp in PI Vision Display API Endpoint

Enhancement Request: Include Modified Timestamp in PI Vision Display API Endpoint Background: We utilize the PI Vision API to back up displays by creating a local folder structure and exporting each display as a JSON file. This backup process invo...
Johan Fitié about 1 month ago in AVEVA™ PI Vision™ / Integration / URL Parameters 0 No status
191 VOTE

PI DataLink for Microsoft Office 365 online

Support PI DataLink on Microsoft Office 365's web portal, Office Online (accessible via a browser). Note that PI DataLink already supports desktop installations of Office 365.
Guest over 2 years ago in AVEVA™ PI DataLink™ / Installation & Upgrading 28 No status
190 VOTE

Automatic Recalculation of Event Frame in PI Analysis

As a user, I would like to have the option to automatic recalculation of event frame for out-of-order input events in AF analysis. The option is available for expression analysis in PI Analysis  2017 R2 but not for event frame generation anal...
Willy Seah Wei Liat over 2 years ago in AVEVA™ PI Server / Analytics & Calculations 25 No status
186 VOTE

Switch between elements in PI Vision mobile

As a user of PI Vision on a mobile device, I need to be able to use existing element-relative displays on the mobile website and swap between assets so that I can dynamically see relevant data for multiple pieces of equipment. The asset dropdown l...
Guest over 2 years ago in AVEVA™ PI Vision™ / Mobile: Phone 17 No status
185 VOTE

Add more advanced string handling functions to the String Builder data reference

I would like to use some more advanced string functions such as Split, Len (string length), and even regex filtering to allow more fine grained control of how some input strings (such as attribute values or substitution parameters) are manipulated...
John Messinger over 2 years ago in AVEVA™ PI Server / Asset Framework (AF) 29 No status
183 VOTE

Introduce a PI OPC UA Server

The OPC landscape is shifting away from DA/HDA and towards UA servers. A significant number of OPC client tools are being created that connect to OPC UA servers, and none of these are compatible with PI without the use of a third party UA wrapper ...
Guest about 2 years ago in AVEVA™ PI System Access (PSA) / PI OPC DA & HDA Servers 46 Declined

Use a calculated variable within another calculation

Many times you will want to re-use the result of a calculation in multiple other calculations. It would be useful to be able to make a calculation once and then include it in multiple other calculations. It can also help to simplify calculations w...
David Boswell 29 days ago in AVEVA™ PI Vision™ / Authoring Displays 0 No status
179 VOTE

Filter expression for inputs to a Rollup

As a user configuring a Rollup analysis, I want to be able to apply a filter expression on the inputs so that the Rollup only includes inputs that satisfy a condition. Note: This was previously Enhancement 114349.
Guest over 2 years ago in AVEVA™ PI Server / Analytics & Calculations 13 No status
170 VOTE

Provide DataLink functionality in a Google Sheets add-on

A significant number of companies are moving from the Microsoft Office suite to "G Suite" (Google). This move takes customers from MS Excel to Google Sheets, and they would like to retain PI DataLink as a functional add-on.
Guest over 2 years ago in AVEVA™ PI DataLink™ / Installation & Upgrading 27 No status

Implement High Availability in AVEVA Identity Manager (AIM)

A few limitations make difficult to architect AIM with PI 2023: No support for NLB No support for failover cluster No support for multiple independent AIM instances As of today, AIM is a single point of failure and so HA is required to preven...
FABIO VENTURUZZO 5 months ago in AVEVA™ PI Server / Security 0 No status